The Latest Nu-Lok Roofing System - Gorsaf, Clynderwen, Pembrokeshire

Below are some of the pictures taken of the re-roofing works carried out in Clynderwen - March 2008. The two properties were re-roofed at teh same, with one customer optin for a non-asbestos compsite slate tile soltuion, whilst the other took out the 50 year guaranteed Nu-Lok Ceramic Slate System.

The roofs were joined using a secret valley to remove the need for an unsughtly lead roll join. The Nu-Lok roof system was also fully insulated as part of a loft conversion, creating what is known as a warm roof system. This is where the insulation sits above the rafters.

The neighbouring roof was raised to allow both roofs to run through at the same height.

The project was approximately 300 meters squared with warm roof insulation, nine Velux windows, secret valley, dry verge, fascias and guttering, and was completed in six weeks with a week being lost to severe gale force winds and rain.

Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System    Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System  Nu Lok Roofing System

Follow rjdayisaok on Twitter